Your building consent will list all the inspections required, but additional inspections are often needed, due to:
- the nature of the project (every building consent application is different so the type and number of inspections will vary)
- change of products or design after the consent is issued
- failing an inspection and needing to re-book at additional cost
- the inspection exceeding the allocated time of 45 minutes.
If your inspection takes longer than the allocated time, you may have to pay additional charges.
Learn more about the types of inspection available from our online inspection glossary.
Read our guide to booking inspections: