Some council services will be unavailable over the Christmas and New Year break.
Check if you need to apply or order before Friday 19 December 2025.
Notice of requirement lodged by NZTA for the designation for a new Shared User Path (SUP) to be constructed from an area 200m north of Quarry Road to the existing Bombay/Mill Road Interchange, and associated infrastructure (NoR 4). The SUP will include the construction of a new overbridge at Great South Road, and tie-in infrastructure at all new and/or upgraded interchanges. This NoR provides a continuation of the SUP authorised under NZTA Designation 6778 (approved under Stage 1B1 of the Papakura to Bombay Project).
The Papakura to Bombay (P2B) Project Stage 2 includes five (5) Notices of Requirement. The purpose the P2B Project Stage 2 is to provide upgrades to SH1 between Drury South and Bombay, improving accessibility for all road users (including active modes), and support regional growth through the improvement of safety, functionality, and resilience of the existing transport corridor.
Lodged on 19 February 2024
Notified on 14 June 2024
Submissions closed: 15 July 2024
Hearings - For more information, see the Hearing Documents.
Recommendation notified on 9 May 2025
Decision notified on 15 July 2025
Appeals closed on 05 August 2025