Skip to main content

Tirohia mēnā me tono whakaaetanga rānei koe mō te whakauru, ki te panoni pūnaha tuku wai para ā-kāinga ake rānei

Check if you need a consent to install or alter an on-site wastewater system

When you might need a building and resource consent to install or alter an on-site wastewater system

You will need a building consent, and you may need a resource consent to install a new wastewater system or to make proposed alterations to that system. The consents ensure the system complies with the building code and doesn't endanger the environment or public health.

You may need a resource consent for discharging the treated wastewater (water from showers, baths, washing machines and toilets) onto or into your land.

​You will need to renew your consent when it expires (usually after 10 or 15 years).

Our tip

If you sell your property, you will need to transfer the consent to the new owner. Otherwise we will continue to charge you the monitoring fee.

Reasons why else you might need a resource consent

  • Your proposed works don't comply with the Auckland Unitary Plan, Chapter E5 rules.
  • Your proposed effluent field will be installed:
    • in the '1 in 20yr ARI floodplain' area
    • on earthworked or potentially compacted land
  • Your system and design is not in accordance with the Technical Publication No. 58 (TP58).

Proposed works that might not need a building or resource consent

You can do maintenance, minor repairs, replacements or alterations to drains or a component of an existing system, without a building consent.

Auckland Unitary Plan, Chapter E5 lists permitted activities (P) for which you won't need a resource consent. It also states the standards for those activities.

You still need to ensure your proposed works comply with the New Zealand Building Code.

​How to check if you need a consent to install a wastewater system

By phone

Call us on 09 301 0101 and ask for the planning helpdesk to check if you need a consent.

You should know

Your building work must:
  • comply with the Building Code, even if no building consent is needed
  • not damage public service drains if its foundations are close to the pipes.

 Related topics

 

 

Rainwater tankshttps://www.aucklandcouncil.govt.nz/environment/looking-after-aucklands-water/rainwater-tanksRainwater tanksLearn the advantages of collecting rainwater on your property, how to use it, and information on installing an outdoor water tank.aspxEnvironment
Install or alter an on-site wastewater treatment and disposal systemhttps://www.aucklandcouncil.govt.nz/building-and-consents/building-renovation-projects/Install-alter-on-site-wastewater-treatment-disposal-systemInstall or alter an on-site wastewater treatment and disposal systemCheck when you need a consent to install or alter an on-site wastewater system, what you need to know before you apply for a consent, and your responsibilities after you've installed the system.aspxBuilding and consents
Onsite wastewater system compliancehttps://www.aucklandcouncil.govt.nz/environment/looking-after-aucklands-water/water-quality-targeted-rate/Pages/onsite-wastewater-system-compliance.aspxOnsite wastewater system complianceA regional compliance system ensuring property owners with onsite wastewater units provide regular documentation that their systems have been inspected and are in good working condition.aspxEnvironment
Safe Networkshttps://www.aucklandcouncil.govt.nz/environment/looking-after-aucklands-water/water-quality-targeted-rate/Pages/safe-networks.aspxSafe NetworksSafe Networks conduct monitoring and investigations in our streams, watercourses and stormwater network to identify contaminants and track them to their source.aspxEnvironment
Before you apply for wastewater system building consenthttps://www.aucklandcouncil.govt.nz/building-and-consents/building-renovation-projects/Install-alter-on-site-wastewater-treatment-disposal-system/Pages/before-apply-wastewater-system-building-consent.aspxBefore you apply for wastewater system building consentWhat you need before you apply for a building consent to install or alter a wastewater system and what documentation you will need to sign off your works.aspxBuilding and consents
Your responsibilities after you install a wastewater systemhttps://www.aucklandcouncil.govt.nz/building-and-consents/building-renovation-projects/Install-alter-on-site-wastewater-treatment-disposal-system/Pages/responsibilities-after-install-wastewater-system.aspxYour responsibilities after you install a wastewater systemFind out what your responsibilities are after you have installed a wastewater disposal and treatment system.aspxBuilding and consents