Some online services – including MyAuckland – will be unavailable from 5pm on Friday 20 March to 8am on Monday 23 March, due to a system upgrade.
Please plan ahead or complete your online request after services return on Monday 23 March.
Your engineer needs to provide:
If we approve your consent application, your system needs to be installed as per the approved building and resource consent documentation and conditions.
You will also need to apply for a Code Compliance Certificate (CCC). This is to ensure that the works carried out comply with the building consent and Building Code.
The registered drainlayer that installs the system will need to provide:
The engineer who is registered with us, needs to:
You will also need a copy of the maintenance agreement (from the professional who will be doing ongoing maintenance of the system).