About the notice of requirement
Notice of requirement lodged by NZTA to alter State Highway 1 (SH1) Designation 6706 ‘Motorway – between Takanini and Hamilton’ to authorise the construction, maintenance and operation of SH1 improvements between an area 200 metres north of Quarry Road overbridge and, an area north of the proposed Drury South Interchange, and associated infrastructure (NoR 1).
The Papakura to Bombay (P2B) Project Stage 2 includes five (5) Notices of Requirement. The purpose the P2B Project Stage 2 is to provide upgrades to SH1 between Drury South and Bombay, improving accessibility for all road users (including active modes), and support regional growth through the improvement of safety, functionality, and resilience of the existing transport corridor.
Status
Lodged on 19 February 2024
Notice of requirement documents
Lodged documents
Is the information on this page helpful?
To ask for help or report a problem with our services or facilities, contact us.