About the notice of requirement
City Rail Link Limited is proposing to alter the Britomart Transport Centre Designation to enable the retention of the Station Plaza Accommodation building at Britomart, so that the building and surrounding Station Plaza area can be used as a construction support facility for works in the City Rail Link tunnels located within the adjoining designation.
In summary, the construction support activity proposed to be undertaken under this NoR is:
- Site office, worker accommodation, and some storage of materials within the SPA building;
- Establishing and operating ventilation equipment in the Station Plaza area (to provide ventilation for workers in the CRL tunnels to the west);
- Access for workers and deliveries of equipment and materials via the Glasshouse and former Chief Post Office (CPO) building; and
- Receiving and pumping concrete into the CRL tunnels (to construct the railway track bed) from the Station Plaza area alongside Tyler Street.
Direct
Referral
Click here to find out all about the Direct Referral process and what submitters need to do.
Status
Lodged on 25 June 2021.
Notification on 13 July 2021.
Submission closed on 10 August 2021.
Consent Order issued on 08 November 2021.
Confirmed on 08 November 2021.
Is the information on this page helpful?
To ask for help or report a problem with our services or facilities, contact us.