PC 83: Additions and amendments to Schedule 10 Notable Trees Schedule

Operative

About the plan change

Plan Change 83 aims to undertake the following:

  • Additions to Schedule 10
    • the addition of 24 individual trees and four groups of trees to Schedule 10
    • the introduction of an automatic update clause
  • Addressing inaccuracies/inconsistencies in Schedule 10 Notable Tree Schedule and Chapter D13 Notable Trees Overlay
    • the amendment of a further 64 listings in Schedule 10
    • the removal of 51 trees in Schedule 10 where the trees are no longer present or health has deteriorated considerably
    • the removal of reference in Chapter D13 Notable Trees Overlay to diagrams which have been removed

If you would like to nominate a tree to be scheduled (which is outside of the scope of this plan change), see Nominate a tree to be evaluated for scheduling as a notable tree for more information on how to do this.

PC 83 Notable Trees Information Sheet (PDF 238KB)

Status

Notification: 18 August 2022

Submissions close: 29 September 2022.

Summary of Decisions Requested notified on 5 December 2022.

Further submissions period extended and has now closed midnight 20 January 2023.

Partial withdrawal – Clause 8D on 4 April 2023.

See the National Policy Statement on Urban Development (NPS-UD) independent hearings webpage.

Hearings - For more information, see the NPS-UD Hearing Documents.

Decision notified on 17 August 2023.

Appeals close on 28 September 2023.

Fully operative on 16 February 2024.


Plan change documents

Operative documents

Decision documents

Partial withdrawal – Clause 8D – 4 April 2023

Further submission report documents

Extension of time to Further Submission period

Notification of summary of decisions requested documents

Notification documents

 By email


 By post