E tono mō tētahi panonitanga (nui tonu nei) ki tō whakaaetanga hanga whare
Apply for an amendment (major variation) to your building consent
If approved, any amended application becomes part of the approved building consent documents file for that building project.
Page Content
Check if you need to apply for an amendment
If you want to change your plans before or during construction, you need to let us know.
Generally, where the work is not a
minor variation but is still within the scope of the original consent, it is an amendment.
Talk to your building inspector if you are unsure whether an amendment or a
minor variation is required.
For more information on the difference between amendments and minor variations, see our guidance document AC2224 Amendments and minor variations.
Examples of changes that need an amendment
- You no longer want to build a deck or carport shown on the building consent drawings.
- You want to build an ensuite bathroom instead of a walk-in wardrobe shown on the building consent drawings.
- A change to the assembly (for example, acrylic shower unit to a tiled shower unit).
- Timber joists complying with NZS 3604 are shown on the building consent drawings, but your builder advises you to change to a manufactured proprietary joist system.
- You want to change part, or all, of the proposed cladding system.
- A new house is approved with a perimeter foundation wall and ordinary internal piles, but you decide to construct a complete timber pile foundation instead, or a raft foundation.
These examples are considered amendments because they impact on Building Code compliance.
Drawings will need to be changed so that plans and specifications accurately reflect what will be built.
Wait for approval of your amendment
You need to wait for our approval of the proposed amendment before you do the work.
Changes that need a new building consent
Where the work is outside the scope of the original consent, or involves additional work, you will need to apply for a new building consent.
Examples of new work:
- Increasing the footprint of the building.
- Adding another floor.
- Adding a retaining wall, outbuilding or similar structures.
Application fees for amendments
* All fees are indicative only and are subject to change.
Read fee table.
Description | Deposit |
---|
Project value up to $19,999 | $800 |
Project value $20,000 to $99,999 | $1100 |
Project value $100,000 and over | $1500 |
Online
Apply now
We only accept online applications for this service. If you are unable to apply digitally, visit one of our libraries with council services for assistance in making your online application.
Our staff will accept your documents for an
additional charge. The charge covers costs involved with us scanning your documents into our digital building consent system.
Call us on 09 301 0101 to speak with our building and planning help desk if you have questions regarding your application.
Additional Content
What happens next
We will process your application within
20 working days.
Related topics
Extension of time to commence building work | | https://www.aucklandcouncil.govt.nz/building-and-consents/building-consents/making-change-building-consent/Pages/extension-time-commence-complete-building-work.aspx | Extension of time to commence building work | Find out how to apply for an extension of time to commence your building work. | | | | aspx | | | | | | | | | Building and consents | |
Make a change to a building consent | | https://www.aucklandcouncil.govt.nz/building-and-consents/building-consents/making-change-building-consent | Make a change to a building consent | Check if you need a minor variation or an amendment when you need to make a change to your building consent. | | | | aspx | | | | | | | | | Building consents | |
Apply for a minor variation to your building consent | | https://www.aucklandcouncil.govt.nz/building-and-consents/building-consents/making-change-building-consent/Pages/apply-minor-variation-building-consent.aspx | Apply for a minor variation to your building consent | If you are making changes to a building consent, find out if you need to submit a minor variation. | | | | aspx | | | | | | | | | Building consents | |
Change Licensed Building Practitioner (LBP) details for your project | | https://www.aucklandcouncil.govt.nz/building-and-consents/building-consents/making-change-building-consent/Pages/change-LBP.aspx | Change Licensed Building Practitioner (LBP) details for your project | Find out how to change the details of LBPs doing, or supervising, your restricted building work. | | | | aspx | | | | | | | | | Building and consents | |
Altering an existing building | | https://www.aucklandcouncil.govt.nz/building-and-consents/building-renovation-projects/make-changes-existing-building/Pages/altering-existing-building.aspx | Altering an existing building | What to do if you intend to alter your existing building. | | | | aspx | | | | | | | | | Building consents | |
Is the information on this page helpful?
It is helpful for us to know what works well for customers.
You will not receive a reply. Do not include personal information.