It is important to set up your work site well at the beginning of your project. Building sites pose a risk to the environment, as everything that enters a drain goes straight into our streams, waterways and the sea.

Manage the main risks

  • Exposed soil and clay can be washed into waterways by rain leading to harmful sediment build-up.
  • Toxic material like cement and paint can be spilled or washed into waterways from cleaning.

By managing the risks (as outlined below), you can avoid fines and re-work, and protect Auckland's waterways.

You should know

You can be fined $750 as an instant fine if you do not manage the main risks. In extreme cases, $750 per day if the offence continues. Usually we issue an abatement notice (a warning), demanding the activity stops until you install erosion/sediment controls.
If there is deliberate intent to ignore the directions of the Resource Management Act and council, you can be prosecuted. Prosecutions can result in fines of up to $300,000

​Prevent exposed soil and clay from being washed into waterways

  • Cover exposed earth with mulch, straw or tarpaulins, so rain doesn't wash the soil away.
  • Work in stages, so only small areas are exposed at a time.
  • Use cloth to stabilise aggregate around entranceways and stop vehicles tracking mud into the road.
  • Install a silt fence on the downhill slope of your site, to catch water runoff.

Protect drains

As well as managing your building site, you can also install protection where water enters the drain.

  • Install sand socks in the kerb channel.
  • When removing dirty water from your site, pump it:
    • onto a surface where it can soak into the ground
    • into a tank, so the sediment can settle to the bottom
    • through a filtration device.

How to work with toxic material

Concrete, cement and paint are all highly toxic in the natural environment.

  • Don't work with paint or concrete in the rain.
  • Establish a designated wash-down area on your site.
  • Wash all equipment on grass, so the runoff can't enter a drain.
  • If there is a spill, do not wash the material into the drain. Phone our pollution hotline on 09 377 3107 for advice.

Consent conditions for managing pollution on your building site

Your building and resource consent will include conditions for protecting the environment.

Make sure you and your contractors know what these are, and keep a copy of your consents on site so you can check them.

Best practice guidance for site management

Video guidance

 Related topics

 

 

Make a change to a resource consenthttps://www.aucklandcouncil.govt.nz/building-and-consents/understanding-building-consents-process/starting-building-renovation-work/making-change-to-resource-consentMake a change to a resource consentFind out how to make changes to a resource consent, after it has been issued.aspx
Make a change to a building consenthttps://www.aucklandcouncil.govt.nz/building-and-consents/understanding-building-consents-process/starting-building-renovation-work/making-change-building-consentMake a change to a building consentCheck if you need a minor variation or an amendment when you need to make a change to your building consent.aspx
Change Licensed Building Practitioner (LBP) details for your projecthttps://www.aucklandcouncil.govt.nz/building-and-consents/understanding-building-consents-process/starting-building-renovation-work/Pages/change-LBP.aspxChange Licensed Building Practitioner (LBP) details for your projectFind out how to change the details of LBPs doing, or supervising, your restricted building work.aspx
Notify us of your Licensed Building Practitioner (LBP)https://www.aucklandcouncil.govt.nz/building-and-consents/understanding-building-consents-process/starting-building-renovation-work/Pages/licensed-building-practitioner.aspxNotify us of your Licensed Building Practitioner (LBP)Find out how to notify us of Licensed Building Practitioners (LBPs) doing, or supervising, your restricted building work.aspx
Documentation to collect as you gohttps://www.aucklandcouncil.govt.nz/building-and-consents/understanding-building-consents-process/starting-building-renovation-work/Pages/documentation-to-collect-as-you-go.aspxDocumentation to collect as you goFind out what documentation you need to collect throughout your project.aspx