Apply for a minor engineering approval

COVID-19 Alert Level 2 – Building and consents information

Some service centres will reopen at Alert Level 2. For more information, see Visit us. Regulatory services functions such as in-person pre-application meetings and drop-in consultations will not be available under Alert Level 2. We will only accept hard copy applications for licensing services such as food, alcohol, and health businesses. All building and resource consent applications must be submitted online.

Minor engineering approval application fee

Read fee table.
Service Deposit
Approval of engineering works (minor) and common access way$600

How to apply for a minor engineering approval

Only use this form for minor works, such as:

  • public stormwater and/or wastewater connections within the site
  • renewal of a public stormwater pipe to the same grade and alignment
  • isolated rehabilitation of existing pipe or manhole
  • raising or lowering a public manhole lid.

 Online

Engineering approval - minor

If you get stuck, consult the online application guide PDF, located towards the end of the When you need an engineering approval page. 

 By post

​Send your completed application form, supporting documents and cheque payment to:

Auckland Council

  Private Bag 92300

  Auckland 1142

 In person

​Bring your completed application form and supporting documents to a service centre nearest to the address of your project, and pay by:
  • cash
  • cheque
  • Eftpos
  • MasterCard or Visa (a convenience fee of 1.75 per cent of your payment amount applies).

Our tip

At the end of the process, you may need to pay the maintenance bond.

What happens next

We process the engineering plan approvals within 20 working days unless additional information is required.

We will let you know the decision by email and post.

Phases in the engineering approval process

  1. Assessment and approval of proposal
  2. Construction and inspection
  3. As-built documentation review and completion, and transferring ownership of an asset (like infrastructure).

 Related topics

 

 

Consider stormwater when buildinghttps://www.aucklandcouncil.govt.nz/building-and-consents/stormwaterConsider stormwater when buildingIf you are doing any sort of development, one of the factors you need to consider is stormwater. Find out what you need to know about stormwater before you begin.aspx
Apply for a major engineering approvalhttps://www.aucklandcouncil.govt.nz/building-and-consents/engineering-approvals/Pages/apply-major-engineering-approval.aspxApply for a major engineering approvalFind out how to apply for a major engineering approval and download the engineering as-built requirements. aspx
Common access way approvalhttps://www.aucklandcouncil.govt.nz/building-and-consents/engineering-approvals/Pages/common-access-way-approval.aspxCommon access way approvalFind out what a common access way is, and if there are any regional differences in the design and construction processes. It also provides information on how and why we test the common access way.aspx
Construct drainage over neighbouring propertieshttps://www.aucklandcouncil.govt.nz/building-and-consents/engineering-approvals/Pages/engineering-approval.aspxConstruct drainage over neighbouring propertiesFind out what you can do if you want to construct drainage over neighbouring properties but your neighbours grant or refuse to grant you access approval.aspx
Guidelines for engineering approval applicationshttps://www.aucklandcouncil.govt.nz/building-and-consents/engineering-approvals/Pages/guidelines-engineering-approval.aspxGuidelines for engineering approval applicationsRead what you need to apply for an engineering approval and the naming standards to use if you apply online.aspx
When you need an engineering approvalhttps://www.aucklandcouncil.govt.nz/building-and-consents/engineering-approvals/Pages/when-need-engineering-approval.aspxWhen you need an engineering approvalFind out what type of work might need an engineering approval and how can our development engineers help. aspx